Announcement

Collapse
No announcement yet.

Dressing Slabs

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Brian @ Muir
    replied

    Leave a comment:


  • bogmer
    replied
    Originally posted by master finishing View Post
    Metalwood Studio in Barrie has a planer/sander for this purpose. Its a drive but they can do this pretty easily. (705) 735-3300

    You could call Davy at Allied Stars in London. (519) 488-4822 They Sell Abrasives and might be able to guide you to someone in your area that can do this job.

    Leave a comment:


  • Leo Van Der Loo
    replied
    Originally posted by Frank D. View Post
    Slab has 2 common meanings. One is an outside slice of a log, the other is thick piece of wood (thick board). A good dictionary will give you both.
    https://www.merriam-webster.com/dictionary/slab
    Yes as you say Frank, as a slab of cake or a slab of rock etc.

    In the Netherlands we have two words for the different pieces of the log that are sawn, the first part with the bark on it that is sawn off the log is called a scab and the next piece would be a plank, with or without the bark on the edge, it could be thick or thin, but no confusion of what is what

    Leave a comment:


  • master finishing
    replied
    Metalwood Studio in Barrie has a planer/sander for this purpose. Its a drive but they can do this pretty easily. (705) 735-3300

    You could call Davy at Allied Stars in London. (519) 488-4822 They Sell Abrasives and might be able to guide you to someone in your area that can do this job.

    Leave a comment:


  • Frank D.
    replied
    https://www.merriam-webster.com/dictionary/slab

    Leave a comment:


  • RV Sam
    replied
    Originally posted by bkrits View Post

    Not all slabs have the bark on one side
    Me calls them live edge !

    Leave a comment:


  • Brad805
    replied

    Leave a comment:


  • Brian @ Muir
    replied

    Leave a comment:


  • bogmer
    replied

    Leave a comment:


  • mitchy5104
    replied

    Leave a comment:


  • bkrits
    replied
    Originally posted by RV Sam View Post
    I am "guessing" these are really not slabs but glue ups ? A slab that big would have come from one very Large tree. A Slab to me is the outside of the log that is cut off in milling the log into lumber. Flat saw cut one side, the other half round with bark on it .
    If it is a glue up you are wanting done there are lots of 50"+ shops with sanders that big but not sure if they would want to play with outside work coming in. The glue used is very important to us with wide belt sanders.
    Not all slabs have the bark on one side

    Leave a comment:


  • RV Sam
    replied
    I am "guessing" these are really not slabs but glue ups ? A slab that big would have come from one very Large tree. A Slab to me is the outside of the log that is cut off in milling the log into lumber. Flat saw cut one side, the other half round with bark on it .
    If it is a glue up you are wanting done there are lots of 50"+ shops with sanders that big but not sure if they would want to play with outside work coming in. The glue used is very important to us with wide belt sanders.

    Leave a comment:


  • WoodBob
    replied

    Leave a comment:


  • bkrits
    replied
    Originally posted by mitchy5104 View Post
    Looking for someone in the London area that can flatten and run 2 large ash slabs rough 4’x8’ through a wide belt sander?Know of anyone?
    If those slabs are rough sawn and not flat no one is going to put them through a wide belt sander, unless they don't care about their machinery and if they don't care about their machinery you won't get a good job, the slabs need to be flat and brought to thickness, the belts they use on those sanders are expensive expect to pay for at least one belt, I have never seen a 48 inch surface planer or thicknesser so you will be struggling to get it flat that way.
    Your answer is to find someone with a CNC machine that will flatten it or set up a router on a sledge, the CNC machining will cost $, making a sledge will take time and cost $.
    Your cheapest option is to get a big hand plane and put some sweat into it, maybe hire a floor sander but beware of digging holes in it, when you have it flat and it is exposed to any climate change it won't be flat anymore, I have a slab table outside it is constantly moving but its an outdoor table, I used a big hand plane and a hand held 4 inch belt sander.
    Good luck

    Leave a comment:


  • bogmer
    replied

    Leave a comment:

Working...
X